Tuesday, April 29, 2008

Bounty Commerical Lisa Loeb

IDU (Instituto Desarrollo Urbano)

MOUNT PEDESTRIAN BRIDGE ON THE WAY TO PLAIN

IDU makes it easier to VIA AL LLANO

During the night of Thursday 27 March until dawn on Friday, made the IDU installation of a new metal footbridge on the road to the plain, at the height of the Divine Portal neighborhood.

To carry out this activity will require the complete closure of the road to Llano from 10pm on Thursday 27 March until 5am on Friday 28 in both directions, for those moving in a north-south street closure will begin on the south and for 115 who mobilize southbound -north at the height of the old road to Llano.Los cars bound for the road to Llano, should take the race where 10 will access the old road to Llano in the sector of John King, to leave the highway to Villavicencio before the first tunnel of the concession. The same detour in reverse will apply to those who move to Bogotá.El heavy vehicle traffic will be totally restricted during the period of closure.
  • STRUCTURE HEIGHT IS LOCATED AT THE GATEWAY DISTRICT DIVINE.
  • ACTIVITY WILL BE HELD FROM 10 PM THIS THURSDAY, MARCH 27 AND FRIDAY UNTIL DAWN.
  • DURING THIS ACTIVITY WILL BE COMPLETELY CLOSED TO TRACK LEVEL IN THE FIELD OF THE ASSEMBLY.
Press IDU
edited March 26, 2008